Vaillant Heat Pump and Battery Installation, Morden SM4

Between 29 October and 4 November 2026 our engineers replaced the gas boiler at a house in Morden, SM4, with a Vaillant air source heat pump, and fitted a Fox ESS home battery on the same wall outside.

  • ReplacedGas boiler
  • Postcode areaSM4

020 3837 0778

Morden SM4, installed by Green Electro Heating

The boiler cupboard now holds the hot water

The house had a Vaillant gas boiler in a cupboard off the living space. The boiler came out, and a hot water cylinder now stands in the same cupboard, piped in copper with its expansion vessels, so nothing new had to find room inside the house.

The Vaillant controls sit in the cupboard below the cylinder, where an engineer can reach them at the yearly service without moving anything else.

One tidy wall outside

The heat pump is a two-fan Vaillant monobloc. It stands on anti-vibration feet on a concrete base at the side of the house, with the pipework run low along the foot of the wall.

Beside it are three rotary isolators, then the Fox ESS H1 5 kW hybrid storage inverter on the wall and the Fox ESS CQ7 battery on its own slab below it. The battery uses lithium iron phosphate cells, and every cable between the inverter, the battery and the house runs in black conduit.

New electrics for the new load

A heat pump and a battery change what the house asks of its supply, so we made up a new consumer unit for the house as part of the job.

More of our heat pump work nearby: Air source heat pump installation Wimbledon.

The job in short

Installation summaryMorden SM4
MCS certified
NIC-601634
Postcode area
SM4
Completed
November 2026
Installed by
Our own engineers

The installation

Heat pump
Vaillant air source, two-fan monobloc
Replaced
Gas boiler
Hot water
Hot water cylinder in the old boiler cupboard
Battery
Fox ESS CQ7, lithium iron phosphate
Inverter
Fox ESS H1 5 kW hybrid storage inverter
Electrics
New consumer unit and outdoor isolators

Included in the installation

  • Heat pump installation
  • Hot water cylinder installation
  • Boiler Upgrade Scheme grant application
  • Grant voucher redemption
  • Building Control certificate and DNO commissioning
  • MCS certification and paperwork
  • Warranty registration and insurance-backed warranty
Boiler Upgrade Scheme grant£7,500, applied for and redeemed by us
VAT0%

Every job is priced from a free survey of the house. Your fixed written price comes after it, before any work starts.

Photos from the job

The finished wall: the Vaillant heat pump, three isolators, the Fox ESS inverter and the battery. The two-fan Vaillant unit on anti-vibration feet, set on a concrete base. The Fox ESS hybrid inverter on the wall above the battery, with its cables run in black conduit. The battery stands on its own slab, raised on feet off the ground. The rating plate of the Fox ESS H1 5 kW storage inverter. Before: the gas boiler in the cupboard, above the white cabinet. After: the hot water cylinder in the same cupboard, with the expansion vessels and the Vaillant controls below. The new consumer unit being made up before it went on the wall. Our engineer at the battery during the final checks, beside the Vaillant heat pump.

Thinking about a heat pump in Morden or Merton?

We survey the house, measure the heat loss room by room and send a fixed written price, with the £7,500 grant taken off where it applies. No cost and no obligation.